Way routes Search - Two floors of the property to be re-Pave for children with Cat 7 ...

by 3 weeks ago

problem

from copper wire to fiber optic provider in the upgrade of Internet routes (coax from the house connection) to be two-storey new networked, the EC currently location of the router in exchange for Keller

 

smart solution

CAT 7 in the laying of 30 meters through a shaft, the path of the second cable erweisst out to be not easy, but a solution which found spontaneously in customer satisfaction

 

Keep it up - and like always ...

work in the eight hours were again instructional empire and was fun ...

 

The first track on the ground floor with putting a new box

THUS, the first 15 meters from the ground floor towards the basement at the customer on site

 

20180929_115112.mini.jpg

 

20180929_115120.mini.jpg

 

20180929_143030.mini.jpg

 

20180929_150129.mini.jpg

 

20180929_154744.mini.jpg

 

Managed - almost completed the second route

the next 15 meters Easily tightened ...



 

20180929_155056.mini.jpg

 

20180929_160116.mini.jpg

 

20180929_161317.mini.jpg

 

20180929_170734.mini.jpg

 

Now the cans on the ground floor and first floor ran, the data stream will soon have to die too ...

 

20180929_175804.mini.jpg

 

20180929_190204.mini.jpg

 

20181002_171426.mini.jpg

 

again expand cans and a distance

Access for the two Point`s in master slave mode ...

 

 

20181002_182323.mini.jpg

 

20181002_200647.mini.jpg

 

20181002_201713.mini.jpg

 

20181004_182907.mini.jpg

 

unifi-ap-ac-pro-features-dual-band-compare.jpg

 


 

 

German solution Implementation in your own home

 

https://smartit.nrw/project/norden-sueden-westen-im-weg-gesuche/

 

 

 

 

 

 

 

 

{"location":{"title":"Mangenberger Str. 10, 42655 Solingen, Deutschland","placeId":"ChIJU_ScjYLUuEcRbAEJUiMvznA"},"addedProducts":[{"id":"unifi-ac-mesh-pro-ap-beta","count":2}],"solved":"","numbers":"","description":"","mainImage":"184436i54A5E86E6FF7E481"}

Comments
by
2 weeks ago

You should flip the wall mounted switches over to help prevent any debris (not just during install) falling into ports. Especially with POE switches. 

by
2 weeks ago - last edited 2 weeks ago

Hmm.

I don't quite understand, but the installation there in MESCH mode

works perfectly for this customer ( Germany ) / 100 MBIT

(I like to take real-time photos "even with dirt" to preserve reality)

 

 The so-called "models" network sockets, tools are usually brought into the picture afterwards ...

 

20181002_182323.mini.jpg       20181002_171945.mini.jpg

 

 

It was made after completion of me personally also clean Man Very Happy

by
2 weeks ago

Untitled.png

 

 

Dust can enter the switch ports like this.

Turn it 180 degrees around so the ports face downwards.

by
2 weeks ago - last edited 2 weeks ago

Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy   Caught   Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy

 



Exactly 2 minutes "After photo was caught here" !!!

Because this switch was shot ( after review ) shortly before the wiring ...

 

20181002_201713.mini.jpg    20181002_203558.mini.jpg


Afterwards ( patching / cable stripping colors seal especially pin 6 ) the wiring

 

Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy If we go into detail, then I see a 20-30 ° dust ramp Man Very Happy Man Very Happy  Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy Man Very Happy

 

 

Behind the curtains to open the Rehgibs wall, to feel the not seeing residual garbage of the cable sheaths in seeking

a cable connection for the purpose of stretching [ 01 ] connection !


But, in self view also of the time will and the own energy of the assembly,

let me admit this also /

                                               in the ulterior motive of the time the mindfulness 90% of the functionality in

                                                                                              #customersatisfaction  ...

 

 

                       ubmt_20181002_203601a.jpg

 

 

Before the installations were taped ( adhesive tape )

 

 

 

by
2 weeks ago

Is there a reason you're not using a PoE switch so that you don't have to put the injector in the person's place?

by
2 weeks ago

The customer did not want in his case !!!
The solution with the PoE adapter was sufficient !

by
2 weeks ago

Why use the Ethernet over Power adapter? Why not use a wireless mess? Why not put the POE adapter at the start of the cable, if it is a short enough run.

by
2 weeks ago

Because the switch is installed on the AP of the CUSTOMER SELF ...


And the banana is Krum because it grows towards the sun !

by
2 weeks ago

this version english to me strange as said yoda

by
a week ago

Scheise Bernd, dein Englisch gibs ganich mehr!

 

Ach und deine Domain liest sich wie "schlaue Titte", aber du machst das schon!

by
a week ago

Who's Bernd?